The porch railings are in! They look great.
The master bathroom has some tile now. I'm loving the accent tile. Can't wait to see it finished.
Seat in the shower.
The shampoo shelf is a little higher than they typically put them because we asked the builders to put in wood blocking on the other side for the towels.
Window in the shower wall to let light through.
Screened porch with railings now.
Love how the screened porch looks!
Built-in for the master closet.
More built-ins for our master closet.
Digging lines for the septic bed.
Here's the giant hole for the septic tank.
Septic tank getting delivered.
Setting it in just right.
All done!
Digging lines for the geothermal HVAC system.
Unrolling the pipes.
Cleaning up the root piles.
The HVAC unit has been delivered now as well.
No comments:
Post a Comment