Wednesday, March 14, 2012

Baseboards, Crown Molding and Doors - Oh My!

It's another fun-filled, fast paced day today. :)
 Our built-ins have been made and are looking awesome. I can't wait to see them in the closet!
 Here is the start of the mudroom bench. It's upsidedown for now. 
 They will flip it over and it will go here. 
 The trim for the house has been delivered too. I'm super excited about the trim being here and knowing that soon the hardwood floors will be  installed and the trim will finish off the room. 
 Our back porch. 
 We've also had a couple of other deliveries today.
All the doors to the house have been delivered as well!  
 It's a jungle in our house right now!
 See? You can barely walk in here! It's crazy!
They blocked off the area where the stairs will be going so the kiddos won'd decide to go walking where there isn't anything to walk on. :) 
 I love the angled posts! I didn't know how this porch would turn out, but I <3 it!
 Back inside the house, the shower has been tiled. :)
 Just one more tiny section to go and it's done! I am loving the different patterns on the wall. It looks so pretty. :) 

 Our basement bathroom. 
 Exterior of the house on the Master bed/bath side of the house. 
 Gary, the man installing our septic beds stayed late working. 

 He was having someone video his work so he can put it on his website.  
 It was pretty cool watching them film him. 
 I think this part was the highlight of Tommy's day! :)

Pin It!

Tuesday, March 13, 2012

Finished Porch Railings

The porch railings are in! They look great. 

 The master bathroom has some tile now. I'm loving the accent tile. Can't wait to see it finished. 
 Seat in the shower. 
 The shampoo shelf is a little higher than they typically put them because we asked the builders to put in wood blocking on the other side for the towels. 
 Window in the shower wall to let light through.
 Screened porch with railings now. 
 Love how the screened porch looks!

Built-in for the master closet.  
 More built-ins for our master closet. 
 Digging lines for the septic bed. 
 Here's the giant hole for the septic tank. 
 Septic tank getting delivered. 
 Setting it in just right.
All done!

  
 Digging lines for the geothermal HVAC system. 
 Unrolling the pipes. 
Cleaning up the root piles. 




The HVAC unit has been delivered now as well.  



Pin It!

Thursday, March 8, 2012

Choosing Paint Colors


 Wood for the floors has been delivered. 
 It has to wait for the weekend to pass before it can be installed so it can "cure" in the house. 

 Railings are getting started on the back porch. :)

Trying to pick wall color for the fireplace wall. 

Choosing colors for the window wall. 
Colors for the dining/kitchen rooms.

 The master shower is getting formed.
 Future master closet built-ins.
 Front porch.